E355 Honed Tube for Hydraulic Cylinder

E355 Honed Tube for Hydraulic Cylinder

Component I&colon Item INTRODUCTION
1&interval Description&colon
Honed hydraulic cylinder tube is a kind of easy bore metal tube utilised to manufacture hydraulic cylinder barrels that is the core component of a piece of hydraulic cylinder&period 

2&period Commodity&colon E355 honed tube for hydraulic cylinder

three&period of time Measurement assortment&colon 40mm&ast30mm-580mm&ast500mm

four&period of time Accessible steel grade&colon 

SAE&solAISI&colon  SAE1571&comma SAE1026&comma SAE1045&comma SAE4130&comma SAE4140
DIN&colon  ST52&comma ST52&period3&comma ST52&period4
EN&colon  E355&comma C45E&comma 25CrMo4&comma 42CrMo4&comma CK45&comma S45C&comma E410&comma E470
GB&colon  20&num&comma forty five&num&comma 16Mn&comma Q345B&comma Q345C&comma Q345D&comma Q345E&comma 25Mn&comma 27SiMn&comma 

5&period Manufacture strategy&colon Chilly rolled&comma hydraulic cold drawn&comma hot rolled&plusdeep gap uninteresting

6&time period Supply problem&colon 

BK BKW BKS GBK NBK Q&plusT
&plusC &plusLC &plusSR &plusA &plusN
Chilly rolled Cold drawn Tension relieved Annealed Normalized Quenched&plusTempered

7&time period Bore therapy&colon Honing&comma skiving&roller burnishing

eight&time period Bore roughness handle&colon Ra0&period25um max or Ra0&comma 35um max for honed tubes&comma Ra0&period25um max for skived&roller burnished tubes&period 

nine&period of time Conclude complete&colon Plain finishes with sq. cuts&comma free of charge of burrs for honed tubes&time period Little bevelled ends for skived&roller burnished tubes&period 

ten&period of time CZPT export packing&colon In bundles tied with steel strips&period Int&ext oil coating&period of time End plastic caps&time period Exterior packing by PVC luggage and knit luggage&period 

11&time period CZPTized packing and marking can be presented on ask for&period 

twelve&period of time H8 tolerance&colon 

ID range Tolerance ID range Tolerance
eighteen< d ≤30 &plus0&sol&plus0&period033 a hundred and eighty< d ≤250 &plus0&sol&plus0&period072
30< d ≤50 &plus0&sol&plus0&period039 250< d ≤300 &plus0&sol&plus0&period081
fifty< d ≤80 &plus0&sol&plus0&period046 300< d ≤315 &plus0&sol&plus0&period081
eighty< d ≤120 &plus0&sol&plus0&period054 315< d ≤400 &plus0&sol&plus0&period089
120< d ≤180 &plus0&sol&plus0&period063 four hundred< d ≤500 &plus0&sol&plus0&period097

13&interval Distinction in between honed tube and skived&roller burnished tube&colon In hydraulic cylinder sector&comma there are 2 solutions for bore treatment method&colon Honing&comma and skiving&roller burnishing&time period Honing or skiving&roller burnishing leads to distinct interior area graphic&comma but equally guarantee excellent roughness&period 

Inner Surface area Issue OF HONED TUBES&colon

Internal Area Problem OF SKIVED&ROLLER BURNISHED TUBES&colon

Portion II&colon Regularly Asked Inquiries
one&time period MOQ&colon 
CZPTly Min Order Amount can be 2-3 tons&solsize for tubes with OD underneath 250mm&comma and ten tons&solsize for tubes with OD over 250mm&interval Occasionally&comma it relies upon on metal grade you require&period If you need to have special grade like E410&comma E470 or alloy steel tube&comma MOQ should be ten tons&solsize at least&period 
two&interval Shipping and delivery Time&colon CZPTly&comma our supply time for honed tubes is around 40-60 times based on the dimensions and quantities&period of time It will take us 15-thirty days to get raw substance&time period For example&comma if you need 3 tons of small dimension honed tubes 50mm&ast40mm with roughness of Ra0&period25um max&comma it will get us at least 30 times to hone this dimensions&period 
three&period Guarantee&Assure&colon Guarantee&assure period of time is 6 months considering that we provide the tubes&comma and we are not liable for quality problem triggered by improper unloading or storage following shipment&time period We welcome customer’s inspection ahead of cargo&period 
4&time period Payment Strategy&colon We accept payment technique like T&solT&comma L&solC&comma or D&solP&comma but it is dependent on our investigation about clients&time period We have a solution to evaluate the credit history of consumers from all over the world&comma and time and quantity of D&solP we can release is established by the evaluation&period 
five&time period Quality Control&colon 90&percnt of the tubes are created from very hot rolled seamless pipes&time period So&comma high quality of raw materials identified top quality of finished tubes&time period We obtain uncooked materials from stable suppliers who are foremost metal mills&comma and we inspect the raw content as per the specs&period For the duration of our creation process&comma there is inspection and good quality manage in each and every stage&period 

Component III&colon Business INTRODUCTION
We are a manufacturer of cold drawn&comma chilly rolled&comma and hydraulic chilly drawn metal tubes with OD upto 356mm given that 2002&period of time Covering an spot of about 32000M2&comma we have twelve standard workshops with 2 hydraulic chilly drawing benches&comma 4 chain chilly drawing benches&comma and 2 ERW mills&period of time Our services covers all the creation methods from pickling&comma cold drawing&comma warmth treating&comma noticed chopping&comma straightening&comma inspection&comma packing to additional machining &turning&comma chilly drawing die fabrication&comma and products repairation&servicing&period 

Factory Appearance&colon

Uncooked Material Stock&colon

HYDRAULIC Cold DRAWING&colon

MULTI-ROLLER STRAIGHTENING&colon

STRAIGHTENING BY Press&colon

Saw Slicing&colon

LATHES&colon

HONING&colon

DEEP Gap Boring&solDRILLING&colon

SKIVING&ROLLER BURNISHING&colon

 

E355 Honed Tube for Hydraulic Cylinder

Tags