2t Wire Rope Electric Monorail Hoist for Overhead Crane Use

2t Wire Rope Electric Monorail Hoist for Overhead Crane Use

Nucleon Wire Rope CZPT CZPT

Transient Introduction:

ND collection metal wire rope electric hoist is appliance to the newest CZPTpean FEM developing regular with innovative concept, stunning appearance. The generate unit adopts demestic superior point line meshing equipment construction generating the machine has compact reasonable composition. The procedure is easy, practical and operating is safety and productive and meet up with the minimal sounds,power conservation and atmosphere safety requirments.

This series of electric powered hoist applied 11patent technologises.This sequence of merchandise are developed with frequency handle of motor pace, small influence and it can realizr exact positioning. Geared up with intelligent checking recorder which is related to the “black box” of plane,it can uninterruptedly report crane functioning position information and prevent fake operation.The device use routine maintenance totally free design with tiny vulnerability and hassle-free servicing.The overal technical level has achieved the sophisticated amount of related products house and overseas.

Elements Descriptions:

1. three-in-1 difficult surface area twin-speed lifting push unit.
2. three-in-one hard surface trolley with frequency conversion generate device
three. Automatic dress in detection brake
four. 4-stage adjustable rotation lifting restrict change

Samples Photographs:

Specifications Chart:
 

Capability
(t)
Operate Class Peak
(m)
Carry Velocity
(m/min)
Vacation Speed
(m/min)
Beam Width
(mm)
Max Wheel Load
(KN)
Bodyweight
(kg)
1.6 M4-M6 <15 1.6/10 2-twenty 200-three hundred six.20 335
two.5 M4-M6 <15 .8/five. 2-20 two hundred-350 nine.20 350
three.2 M4-M6 <15 .eight/5. two-twenty 250-350 11.60 370
six.three M4-M6 <15 .8/5. two-20 300-450 22.ten 450
eight M4-M6 <15 .8/five. 2-20 300-450 28.twenty 610
10 M4-M6 <15 .8/five. 2-20 300-450 34.80 640
twelve.five M4-M6 <15 .66/4. two-twenty 300-500 forty three.forty     seven hundred

What are crucial to choose a proper hoist:

one. CZPT Capacity
two. Lifting Height
three. CZPT Software and Operate Course
four. CZPT Touring Duration
five. Manage Method: Pendant or Remote Management?
six. Neighborhood Power Source: AC 240/380/400/415/440v fifty/60hz
7. Quantity
eight. Desitination Port

Welcome to Pay a visit to Our Manufacturing facility before Creating up Your Mind!
 

2t Wire Rope Electric Monorail Hoist for Overhead Crane Use

Tags